A 8,400 sq. ft. fire station. A 2,133 sq. ft. meeting and locker room area and 6,267 sq. ft. storage garage. The building construction is a pre-engineered metal building.

Provided architectural engineering services along with plumbing, electrical, HVAC and provided bid documents and construction management services. Completed in 2000.

Located in Granton, Wisconsin.